Keeping tradition with doing things backwards, I’ve finally got a UPS for the rack (mounted in the bottom of the stack). Got a PowerWalker VI 2200R. Its a 2U unit which is all the space I’ve got left in the rack. Decent price and decent I/O with USB, serial and a slot-in for network expansion + 4 IEC outputs. Its powering everything in the rack and connected via USB to my main server which runs a NUT server that other machines can connect to. A calibration run (100-80%) puts the runtime at about 20 min. Long enough that I’m comfortable setting things to shut down when 20% capacity remains. Summary, I sleep better now.

The rack with the UPS at the bottom

NUT output

  • catloaf
    link
    fedilink
    English
    arrow-up
    2
    arrow-down
    1
    ·
    8 months ago

    Drives at the top? Hell no. SANs are heavy, they go in the bottom half too (assuming a mixed rack). Especially if you have those disk shelves that slide out so they hold 3.5" drives three deep. Top of the rack is for network hardware and such.

    • glimse@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      arrow-down
      1
      ·
      8 months ago

      I did not install SANs, I built racks for AV so the only drives were NAS/mini PCs on shelves