• f0rc3u2@alien.topB
    link
    fedilink
    English
    arrow-up
    1
    ·
    1 year ago

    About 10W, as I was looking for a power efficient CPU when I bought the server. So 7kWh a month, a little bit over 2€/month.

    I have been using a j5005 with 16GB Ram, 40TB attached storage (the harddrives are spun down when not in use) for the last five years and so far I never had the impression that I need to upgrade.

    The Gemini lake series supports only 8GB Ram officially, but apparently up to 32GB are possible.