• LoveSausage@lemmygrad.ml
    link
    fedilink
    English
    arrow-up
    1
    arrow-down
    3
    ·
    1 year ago

    Reliability is done by redundance. Build 18000 of them. Also Sweden have plenty of hydropower as well. Worked on windpower in Sweden and seen the maps. Shitload of potential. The real reason is who filled who’s pockets.