• Kusimulkku
    link
    fedilink
    arrow-up
    18
    arrow-down
    1
    ·
    6 months ago

    After 22.5 km (14 mi) of tunnel had been bored and about US$2 billion spent, the project was canceled by the US Congress in 1993.

    LMAO